LOCKWOOD, GREENE & CO. INC.

From The Citadel Archives Guide

(Difference between revisions)
Jump to: navigation, search
(New page: Floor plans, 1922.<BR /> 0.5 linear ft.<BR /> Architectural/engineering firm of Boston, Massachusetts which handled construction of new Citadel campus. Floor plans (6) of first - third flo...)
 
Line 4: Line 4:
Floor plans (6) of first - third floors of Padgett-Thomas barracks. Promotional brochure mentions The Citadel on pages 167 and 172.
Floor plans (6) of first - third floors of Padgett-Thomas barracks. Promotional brochure mentions The Citadel on pages 167 and 172.
-
0-881.
+
AF Lockwood Greene
{{Links}}
{{Links}}

Current revision as of 20:29, 24 June 2008

Floor plans, 1922.
0.5 linear ft.
Architectural/engineering firm of Boston, Massachusetts which handled construction of new Citadel campus. Floor plans (6) of first - third floors of Padgett-Thomas barracks. Promotional brochure mentions The Citadel on pages 167 and 172.

AF Lockwood Greene


Guide Index

1-100 | A | B | C | D | E | F | G | H | I-J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z

Personal tools